top of page

Testing And Commissioning Services

Neutral-Voltage-Displacement-NVD-1.png

Ghad Al Taqat presents Testing and Commissioning Services:

1. Electrical testing: Verifying the integrity of electrical systems, including voltage, current, resistance, and insulation resistance.

2. Mechanical testing: Testing mechanical equipment, such as Diesel Engines pumps, motors, and gearboxes.

3. Control system testing: Verifying the functionality of control systems, including programmable logic controllers (PLCs) and supervisory control and data acquisition (SCADA) systems.

4. Protection relay testing: Testing protection relays and other protective devices.

5. Commissioning: Verifying that systems and equipment are installed correctly, functioning as intended, and meet design specifications.

 

Ghad Al Taqat Testing and Commissioning Services for:

1. Medium voltage (MV) systems: Testing and commissioning MV switchgear, transformers, and cables.

2. Low voltage (LV) systems: Testing and commissioning LV distribution panels, motor control centers, and electrical panels.

3. Renewable energy systems: Testing and commissioning solar, wind, and other renewable energy systems.

4. Industrial automation systems: Testing and commissioning industrial automation systems, including PLCs, SCADA systems, and motor control systems.

5. Building management systems (BMS): Testing and commissioning BMS, including Gensets Battery Banks, HVAC, lighting, and security systems.

 

Benefits of Testing and Commissioning Services:

1. Ensures safety: Verifies that systems and equipment are installed and functioning correctly to prevent electrical hazards.

2. Prevents equipment damage: Identifies potential issues before they cause equipment damage or failure.

3. Optimizes performance: Ensures that systems and equipment operate efficiently and effectively.

4. Reduces downtime: Minimizes the risk of unexpected outages and downtime.

5. Compliance with regulations: Verifies that systems and equipment meet relevant electrical and safety standards.

 

Ghad Al Taqat’s Testing and Commissioning Methodologies:

1. Factory Acceptance Testing (FAT): Testing equipment at the manufacturer's factory.

2. Site Acceptance Testing (SAT): Testing equipment at the installation site.

3. Commissioning: Verifying that systems and equipment are installed correctly and functioning as intended.

4. Maintenance testing: Testing equipment during routine maintenance to ensure continued functionality.

Picture9.png
Arrow_3_edited.png

CONTACT

Inquiries

For any inquiries or commendations,

Please send email to:

contact@ghad-altaqat.com

or call: +966500507232

or fill out the following form:

Head Office

Business Gate, Business Buildings, Building 7, First Floor, Cordoba District, Riyadh, Kingdom of Saudi Arabia

contact@ghad-altaqat.com

m.ghoneim@ghad-altaqat.com

Tel: +966112611417

Mobile: +966500507232

Contact Us

Employment

To apply for a job with Sphere Constuctions, please send a cover letter together with your C.V. to: cv@ghad-altaqat.com

Mob: +966500507232

bottom of page